Bridge construction details

"The nitty gratey details" text over the background of the bridge's metal grates.

Bridge location

  • Peterborough Ward 4 (Ashburnham)
  • Just upstream of Ashburnham Lock 20 on the Trent-Severn Waterway canal
  • 173 Maria Street, Peterborough, Ontario (google maps link here)

Planning and design

  • Bridge owner: Parks Canada (part of the Trent-Severn Waterway)
  • Contract management: Public Services and Procurement Canada. WSP Canada is also providing prime contract administration for the project.
  • Bridge design consultants: WSP Canada, with assistance from Chadwick Engineering Ltd.
  • Impact Assessment: completed in 2025 (pdf here).
    This assessment includes an acknowledgement (page 8) that they did not consider community knowledge.
  • Statement of Cultural Resource Impact Analysis: completed in 2018 (pdf here).
    This is where Parks Canada lays out the principles of the bridge’s design. For example, they wanted the bridge’s design to match other Trent Severn Waterway bridges, and wanted specific colours of paint. The needs of locals using this bridge for functional purposes was not considered.
  • Construction timeline: Fall 2026 – May 2028
  • To subscribe to Parks Canada’s updates on the project, email trentsevern@pc.gc.ca and include “Peterborough Canal Projects” in the subject line.
  • Parks Canada webpage with links to project details, including repairs to the liftlocks and canal shoreline.

The current (old) bridge specs

  • Built in 1965 (the first bridge was built in 1897)
  • Length: 34m (~110 feet)
  • 2 vehicle lanes, with one protected sidewalk on the south side.
View of the bridge, facing west. Two vehicle lanes and a protected sidewalk on the left (south) side.
Facing west.

Let’s do this!

Sign up for campaign updates.

No spam. Just bridge stuff.