{"id":80,"date":"2026-11-09T16:42:34","date_gmt":"2026-11-09T21:42:34","guid":{"rendered":"https:\/\/mariabridgeptbo.ca\/?page_id=80"},"modified":"2026-11-09T16:50:25","modified_gmt":"2026-11-09T21:50:25","slug":"bridging-a-gap-in-peterboroughs-cycle-network","status":"publish","type":"page","link":"https:\/\/mariabridgeptbo.ca\/?page_id=80","title":{"rendered":"Bridging a gap in Peterborough&#8217;s cycle network"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Maria Street bridge is a bottleneck in Peterborough\u2019s cycling network.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On the east side of the canal, Ashburnham Drive has bike lanes and a lovely separated walking\/cycling path. And it&#8217;s planned to expand northward with Ashburnham Drive realignment and the improved McFarlane bridge (<a href=\"https:\/\/www.connectptbo.ca\/ashburnhamea\" target=\"_blank\" rel=\"noopener\">details here<\/a>).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lots of biking at the Beavermead Campground \/ Ecology Park too.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"3526\" height=\"2644\" data-attachment-id=\"176\" data-permalink=\"https:\/\/mariabridgeptbo.ca\/?attachment_id=176\" data-orig-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/07\/ashburnham-bike-path.jpg\" data-orig-size=\"3526,2644\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;1.8&quot;,&quot;camera&quot;:&quot;ELE-L04&quot;,&quot;created_timestamp&quot;:&quot;1781967979&quot;,&quot;focal_length&quot;:&quot;5.58&quot;,&quot;iso&quot;:&quot;50&quot;,&quot;shutter_speed&quot;:&quot;0.000266&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Ashburnham bike path\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/07\/ashburnham-bike-path.jpg\" src=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/07\/ashburnham-bike-path.jpg?w=300\" alt=\"Bike path along Ashburnham Drive, approaching the Maria Street bridge.\" class=\"wp-image-176\"\/><figcaption class=\"wp-element-caption\">Bike path along Ashburnham Drive (on the east side of the canal), approaching the Maria Street bridge.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On the west side of the canal, there are low-traffic streets connecting to the Rotary Greenway Trail. That&#8217;s the trail along the east side of the Otonabee River from Trent down past Hunter Street. It&#8217;s a major north-south bike route. There&#8217;s also a multi-use path along Rogers Cove.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In short, if you want to bike in the east end of Peterborough, you&#8217;re probably going to cross the Maria Street bridge.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"1052\" height=\"657\" data-attachment-id=\"178\" data-permalink=\"https:\/\/mariabridgeptbo.ca\/?attachment_id=178\" data-orig-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/07\/bike-path-along-otonabee-river.png\" data-orig-size=\"1052,657\" data-comments-opened=\"1\" data-image-title=\"Bike path along Otonabee River\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/07\/bike-path-along-otonabee-river.png\" src=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/07\/bike-path-along-otonabee-river.png?w=300\" alt=\"Bike path along east side of Otonabee River, north of Hunter Street.\" class=\"wp-image-178\"\/><figcaption class=\"wp-element-caption\">Rotary Greenway Trail north of Hunter Street.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Maria Swing Bridge is the missing connection between these cycling networks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">One dangerous segment ruins a whole route<\/h2>\n\n\n\n<figure class=\"wp-block-image aligncenter size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"1400\" height=\"603\" data-attachment-id=\"87\" data-permalink=\"https:\/\/mariabridgeptbo.ca\/?attachment_id=87\" data-orig-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/doubleblackdiamond_mariabridgeskisign-1.png\" data-orig-size=\"1400,603\" data-comments-opened=\"1\" data-image-title=\"DoubleBlackDiamond_MariaBridgeSkiSign\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/doubleblackdiamond_mariabridgeskisign-1.png\" src=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/doubleblackdiamond_mariabridgeskisign-1.png?w=300\" alt=\"Ski run sign for a double black diamond run called Maria Swing Bridge. It says &quot;experts only&quot;.\" class=\"wp-image-87\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A single dangerous segment like this bridge can deter people from making the trip by bike.\u00a0 It\u2019s like downhill skiing &#8211; if you have a run that is an easy bunny hill the whole way but you have to do a short double black diamond halfway down, a lot of casual skiers would say &#8220;no thanks I&#8217;d rather not die.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Maria Street bridge is that double black diamond segment. A lot of people won&#8217;t bike from Point A to Point B if they have to bike on this bridge &#8211; it feels too dangerous and stressful. And biking to almost anywhere in the east end requires crossing this bridge.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And that\u2019s why Peterborough has already planned to improve it.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Peterborough Cycling Master Plan<\/h2>\n\n\n\n<figure class=\"wp-block-image aligncenter size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"568\" height=\"738\" data-attachment-id=\"82\" data-permalink=\"https:\/\/mariabridgeptbo.ca\/?attachment_id=82\" data-orig-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/ptbo-cycling-master-plan-cover.png\" data-orig-size=\"568,738\" data-comments-opened=\"1\" data-image-title=\"Ptbo Cycling Master Plan cover\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/ptbo-cycling-master-plan-cover.png\" src=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/ptbo-cycling-master-plan-cover.png?w=231\" alt=\"Cover of the Peterborough Cycling Master Plan\" class=\"wp-image-82\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Peterborough Cycling Master Plan (2022; <a href=\"https:\/\/www.connectptbo.ca\/14308\/widgets\/55911\/documents\/101785\" target=\"_blank\" rel=\"noopener\">pdf here<\/a>) outlines where and when the city plans to improve our cycling network.&nbsp; Its maps show plans for a cycling facility along the road and crossing improvement at the Maria Street bridge (Exhibits <a href=\"https:\/\/www.connectptbo.ca\/14308\/widgets\/55911\/documents\/101785#page=40\" target=\"_blank\" rel=\"noopener\">4.1<\/a>, <a href=\"https:\/\/www.connectptbo.ca\/14308\/widgets\/55911\/documents\/101785#page=47\" target=\"_blank\" rel=\"noopener\">4.5<\/a>).&nbsp; These improvements are planned for 2031-2041 (Exhibit <a href=\"https:\/\/www.connectptbo.ca\/14308\/widgets\/55911\/documents\/101785#page=50\" target=\"_blank\" rel=\"noopener\">4.7<\/a>).<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"653\" data-attachment-id=\"97\" data-permalink=\"https:\/\/mariabridgeptbo.ca\/?attachment_id=97\" data-orig-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/cycleplanex4-1_crossingimprovement-1.png\" data-orig-size=\"1170,653\" data-comments-opened=\"1\" data-image-title=\"CyclePlanEx4-1_CrossingImprovement\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Exhibit 4.1 from the cycling master plan. The Maria swing bridge location is labelled with a star, indicating an intersection or crossing improvement.&lt;\/p&gt;\n\" data-large-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/cycleplanex4-1_crossingimprovement-1.png\" src=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/cycleplanex4-1_crossingimprovement-1.png?w=1024\" alt=\"Map from Peterborough's Master Cycling Plan. The Maria Swing Bridge is shown with a red circle around it. There's a star at the bridge location, pointing to the legend that says it's an intersection or crossing improvement.\" class=\"wp-image-97\"\/><figcaption class=\"wp-element-caption\">Exhibit 4.1 from the cycling master plan. The Maria swing bridge location is labelled with a star, indicating an intersection or crossing improvement.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1078\" height=\"670\" data-attachment-id=\"90\" data-permalink=\"https:\/\/mariabridgeptbo.ca\/?attachment_id=90\" data-orig-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/cycleplanex4-7_networktimeline.png\" data-orig-size=\"1078,670\" data-comments-opened=\"1\" data-image-title=\"CyclePlanEx4-7_NetworkTimeline\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/cycleplanex4-7_networktimeline.png\" src=\"https:\/\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/cycleplanex4-7_networktimeline.png?w=1024\" alt=\"Map from Peterborough's Master Cycling Plan. The Maria Swing Bridge is shown with a red circle around it. The orange routes indicate it's a Medium Term priority (2031-2041).\" class=\"wp-image-90\"\/><figcaption class=\"wp-element-caption\">Exhibit 4.7 from the cycling master plan. The Maria swing bridge is labelled with an orange path, indicating its improvements are planned for 2031-2041.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">So the city plans to add protected mobility lanes to this bridge, next decade. Remember, this isn&#8217;t some decades-old plan &#8211; this was just published in 2022. The city is committed to this plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Why not add-on protected lanes now, while the bridge is under construction??<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If we construct the main bridge now, then add protected mobility lanes next decade (as planned), it&#8217;ll be slower, more expensive, and have double the down-time of the bridge being out of commission for construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If we bundle the protected mobility lanes with the main bridge construction now, it&#8217;ll be faster, cheaper, and have less down-time for traffic.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let\u2019s save money and construction delays by adding the protected lanes now, bundling it with ongoing construction. It just makes sense.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Maria Street bridge is a bottleneck in Peterborough\u2019s cycling network. On the east side of the canal, Ashburnham Drive has bike lanes and a lovely separated walking\/cycling path. And it&#8217;s planned to expand northward with Ashburnham Drive realignment and the improved McFarlane bridge (details here). Lots of biking at the Beavermead Campground \/ Ecology [&hellip;]<\/p>\n","protected":false},"author":35450054,"featured_media":87,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"footnotes":""},"class_list":["post-80","page","type-page","status-publish","has-post-thumbnail","hentry"],"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/PhtJok-1i","jetpack-related-posts":[{"id":100,"url":"https:\/\/mariabridgeptbo.ca\/?page_id=100","url_meta":{"origin":80,"position":0},"title":"Bridge construction details","author":"jayfitzsimmons","date":"October 28, 2026","format":false,"excerpt":"Bridge location Peterborough Ward 4 (Ashburnham) Just upstream of Ashburnham Lock 20 on the Trent-Severn Waterway canal 173 Maria Street, Peterborough, Ontario (google maps link here) Planning and design Bridge owner: Parks Canada (part of the Trent-Severn Waterway) Contract management: Public Services and Procurement Canada. WSP Canada is also providing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"\"The nitty gratey details\" text over the background of the bridge's metal grates.","src":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/06\/nittygrateydetails.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":248,"url":"https:\/\/mariabridgeptbo.ca\/?page_id=248","url_meta":{"origin":80,"position":1},"title":"How can I help?","author":"jayfitzsimmons","date":"November 7, 2026","format":false,"excerpt":"Ok you're convinced - we need protected mobility lanes for the new Maria swing bridge. Awesome - thank you! Sooooo ... now what? Who has the power to make this change? Parks Canada owns the bridge. They're the ones who decide the bridge's design. They're the ones we're holding accountable.\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"Canada Geese walking in the foreground along shore, with the Maria swing bridge in the background, with a school bus crossing it.","src":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/11\/GeeseWithMariaBridge.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/11\/GeeseWithMariaBridge.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/11\/GeeseWithMariaBridge.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/11\/GeeseWithMariaBridge.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/11\/GeeseWithMariaBridge.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/11\/GeeseWithMariaBridge.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":271,"url":"https:\/\/mariabridgeptbo.ca\/?page_id=271","url_meta":{"origin":80,"position":2},"title":"Media coverage","author":"jayfitzsimmons","date":"November 13, 2026","format":false,"excerpt":"Bridge design Peterborough cyclists push back against bridge design without bike lanes.Oct. 23, 2026. Peterborough Examiner article by Sebastian Johnston-Lindsay. Peterborough cyclists ask Parks Canada to alter upgrade plans for Maria Street swing bridge.Oct. 23, 2026. Global News video segment. Peterborough cyclists rally for safer infrastructure as concerns over Maria\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":71,"url":"https:\/\/mariabridgeptbo.ca\/?page_id=71","url_meta":{"origin":80,"position":3},"title":"3 schools. 3 ways protected mobility lanes help them.","author":"jayfitzsimmons","date":"October 28, 2026","format":false,"excerpt":"Protected mobility lines help school kids Three schools are near this bridge: Kaawaate, Immaculate Conception, and Monsignor O\u2019Donoghue. Every day kids and teachers cross the Maria Street bridge to get to and from school. Some cross by bike. But most do not - they are driven by their families. This\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"Map of showing the three schools near the Maria Street bridge.","src":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/image.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/image.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/image.png?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":133,"url":"https:\/\/mariabridgeptbo.ca\/?page_id=133","url_meta":{"origin":80,"position":4},"title":"So many sports (if you can drive there)","author":"jayfitzsimmons","date":"October 28, 2026","format":false,"excerpt":"The first organization to join our cause was the Peterborough Soccer Referees' Branch. That might seem obscure, but there's good reason. A whole lotta soccer here There are 10 soccer fields just east of the bridge, at Eastgate and Beavermead fields. That's a lot of soccer, and it needs a\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"Map of the sports fields and organizations in the vicinity of the Maria Street bridge. Lots of soccer, beach volleyball, canoeing, etc.","src":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/06\/sportsnearbridge.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/06\/sportsnearbridge.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/06\/sportsnearbridge.png?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":19,"url":"https:\/\/mariabridgeptbo.ca\/","url_meta":{"origin":80,"position":5},"title":"Homepage","author":"jayfitzsimmons","date":"May 12, 2026","format":false,"excerpt":"Coming soon The Maria Street swing bridge has reached the end of its life. Parks Canada will be replacing it between 2026 and 2028. The new bridge will have a 75 year lifespan. We want the new bridge to have protected bike lanes. This is our opportunity to build a\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"Profile of the current bridge from the southeast shore, showing some cars on it.","src":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/mariabridge_fromseshore.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/mariabridge_fromseshore.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/mariabridge_fromseshore.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/mariabridge_fromseshore.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/mariabridge_fromseshore.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/mariabridgeptbo.ca\/wp-content\/uploads\/2026\/05\/mariabridge_fromseshore.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/pages\/80","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/users\/35450054"}],"replies":[{"embeddable":true,"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=80"}],"version-history":[{"count":14,"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/pages\/80\/revisions"}],"predecessor-version":[{"id":260,"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/pages\/80\/revisions\/260"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=\/wp\/v2\/media\/87"}],"wp:attachment":[{"href":"https:\/\/mariabridgeptbo.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=80"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}